当前位置: 首页> 国外交通期刊数据库 >详情
原文传递 Syzygy between Design and Construction of Bridges
题名: Syzygy between Design and Construction of Bridges
正文语种: 英文
作者: Dhananjay A Bhide
关键词: template;dictionary;structure;scenarios;project;concept;bridge;observe;aspects;sequence
摘要: One of the dictionary meanings of the word syzygy is "any two related things, either alike or opposite". For any structure, design and construction,if complement each other, more so for bridges then a smooth, hassle free execution follows.If not, then it leads to avoidable delays, changes in proposal&method of construction, extra costs and last problems, that add further to The paper is an attempt to actual works. The study is with contemplated. It covers likely concept stage, required due to control faced during execution as without any syzygy but realized at situation leading to a successful Study also includes a project that had to be abandoned due to but not the least, contractual complications in substantial manner, highlight these aspects with some some executed structures and one scenarios; ensuring syzygy during unfortunate situations beyond well as concepts developed nick of the time salvaging the completion of project in time, was a really a complex proposal but various reasons. However, the details were reviewed from these considerations and some of the observed lacunae along with the remedial measures are presented. Itamply highlights the fact that for complex proposals the requirement of the syzygy assumes an utmost importance. From the details, readers may realize the severity of the consequences, if left unattended and the implications on project.
出版年: 2016
论文唯一标识: I-75Y2016V44N07007
英文栏目名称: Technical Papers
期刊名称: Indian Highways
拼音刊名(出版物代码): I-75
卷: 44
期: 07
页码: 37-51,53-55
检索历史
应用推荐