当前位置: 首页> 国外交通期刊数据库 >详情
原文传递 DEVELOPMENT OF CONCEPT AND GENERAL ARRANGEMENT FOR 2nd BRIDGE ACROSS RIVER KALI ON NH 66 (OLD NH 17), NEAR KARWAR IN KARNATAKA STATE, INDIA
题名: DEVELOPMENT OF CONCEPT AND GENERAL ARRANGEMENT FOR 2nd BRIDGE ACROSS RIVER KALI ON NH 66 (OLD NH 17), NEAR KARWAR IN KARNATAKA STATE, INDIA
正文语种: 英文
作者: Dhananjay A Bhide
关键词: bridge;conglomerate;specification;pendulum;pans;development;ultimate;span;in-situ;prevail
摘要: A new bridge across River Kali was required as part of widening of NH 66 to four lane. A new 2 lane bridge was proposed on downstream side of existing bridge. The bridge length required was 665 same as that of old one. Old bridge had central 4 spans of 122 m. Two spans of 69.5 m and 19.5 m spans were on either ends. Foundations of old bridge are with single circular caisson foundations. Construction of old bridge was with in-situ cantilever construction method. Foundations penetrated through conglomerate stratum. The location had abounded twin circular caisson foundations for proposal with 48.78 m spans. Standing water depth was about 9 m. The new bridge had to comply with code specifications as that have changed over years and prevail now. Old bridge has pendulum hinge bearings for main spans and suspended spans for penultimate spans. These are no longer allowed. The paper describes how the final arrangement evolved after investigating probable fast construction.
出版年: 2017
论文唯一标识: I-75Y2017V45N09005
英文栏目名称: Technical Papers
期刊名称: Indian Highways
拼音刊名(出版物代码): I-75
卷: 45
期: 09
页码: 19-25
检索历史
应用推荐