题名: |
DEVELOPMENT OF CONCEPT AND GENERAL ARRANGEMENT FOR 2nd BRIDGE ACROSS RIVER KALI ON NH 66 (OLD NH 17), NEAR KARWAR IN KARNATAKA STATE, INDIA |
正文语种: |
英文 |
作者: |
Dhananjay A Bhide |
关键词: |
bridge;conglomerate;specification;pendulum;pans;development;ultimate;span;in-situ;prevail |
摘要: |
A new bridge across River Kali was required as part of widening of NH 66 to four lane. A new 2 lane bridge was proposed on downstream side of existing bridge. The bridge length required was 665 same as that of old one. Old bridge had central 4 spans of 122 m. Two spans of 69.5 m and 19.5 m spans were on either ends. Foundations of old bridge are with single circular caisson foundations. Construction of old bridge was with in-situ cantilever construction method. Foundations penetrated through conglomerate stratum. The location had abounded twin circular caisson foundations for proposal with 48.78 m spans. Standing water depth was about 9 m. The new bridge had to comply with code specifications as that have changed over years and prevail now. Old bridge has pendulum hinge bearings for main spans and suspended spans for penultimate spans. These are no longer allowed. The paper describes how the final arrangement evolved after investigating probable fast construction. |
出版年: |
2017 |
论文唯一标识: |
I-75Y2017V45N09005 |
英文栏目名称: |
Technical Papers |
期刊名称: |
Indian Highways |
拼音刊名(出版物代码): |
I-75 |
卷: |
45 |
期: |
09 |
页码: |
19-25 |