其他题名: |
Aly,T.,Elchalakani,M.,Thayalan,P.,and Patnaikuni,I.(2010)."Incremental collapse threshold for pushout resistance of circular concrete filled steel tubular columns."J.Constr.Steel Res.,66(1),11–18.Bhadeshia,H.,and Honeycombe,R.(2006).Steels,microstructure and properties,3rd Ed.,Butterworth-Heinemann,Oxford,U.K.CEN(European Committee for Standardization).(2004)."Design of composite steel and concrete structures.1–1:General rules and rules for buildings."EN 1994-1-1,Eurocode 4,Brussels,Belgium.CEN(European Committee for Standardization).(2005)."Design of composite steel and concrete structures.1–2:General rules-structural fire design."EN 1994-1-2,Eurocode 4,Brussels,Belgium.Chang,X.,Huang,C.K.,Jiang,D.C.,and Song,Y.C.(2009)."Push-out test of pre-stressing concrete filled circular steel tube columns by means of expansive cement."Constr.Build.Mater.,23(1),491–497.Culfik,M.S.,and Ozturan,T.(2010)."Mechanical properties of normal and high strength concretes subjected to high temperatures and using image analysis to detect bond deteriorations."Constr.Build.Mater.,24(8),1486–1493.Ding,J.,andWang,Y.C.(2008)."Realistic modelling of thermal and structural behaviour of unprotected concrete filled tubular columns in fire."J.Constr.Steel Res.,64(10),1086–1102.Gardner,L.(2005)."The use of stainless steel in structures."Prog.Struct.Eng.Mater.,7(2),45–55.Jaspart,J.P.(1991)."Study of the semi-rigidity of beam-to-column joints and its influence on the resistance and stability of steel buildings."Ph.D.thesis,Liège Univ.,Liège,Belgium.Petrus,C.,Abdul Hamid,H.,Ibrahim,A.,and Nyuin,J.D.(2011)."Bond strength in concrete filled built-up steel tube columns with tab stiffeners."Can.J.Civil Eng.,38(6),627–637.Qu,X.S.,Chen,Z.H.,Nethercot,D.A.,Gardner,L.,and Theofanous,M.(2013)."Load-reversed push-out tests on rectangular CFST columns."J.Constr.Steel Res.,81(3),35–43.Roeder,C.W.,Cameron,B.,and Brown,C.B.(1999)."Composite action in concrete filled tubes."J.Struct.Eng.,10.1061/(ASCE)0733-9445(1999)125:5(477),477–484.Shakir-Khalil,H.(1993)."Pushout strength of concrete-filled steel hollow sections."Struct.Eng.,71(13),230–243.Song,T.Y.,Han,L.H.,and Yu,H.X.(2010)."Concrete filled steel tube stub columns under combined temperature and loading."J.Constr.Steel Res.,66(3),369–384.Standards Australia.(2004)."Bridge design.Part 6:Steel and composite construction."AS5100.6,Sydney,Australia.Tao,Z.,Han,L.H.,Uy,B.,and Chen,X.(2011)."Post-fire bond between the steel tube and concrete in concrete-filled steel tubular columns."J.Constr.Steel Res.,67(3),484–496.Tao,Z.,Song,T.Y.,Uy,B.,and Han,L.H.(2016)."Bond behavior in concrete-filled steel tubes."J.Constr.Steel Res.,120(4),81–93.Tao,Z.,Wang,X.Q.,and Uy,B.(2012)."Stress-strain curves of structural and reinforcing steels after exposure to elevated temperatures."J.Mater.Civil Eng.,10.1061/(ASCE)MT.1943-5533.0000676,1306–1316.Virdi,K.S.,and Dowling,P.J.(1980)."Bond strength in concrete filled steel tubes."IABSE Proc.,P-33/80,International Association for Bridge and Structural Engineering,Zurich,Switzerland,125–139. |