原文传递 performance during construction of a cut-and-cover tunnel founded in london clay at edmonton
题名: performance during construction of a cut-and-cover tunnel founded in london clay at edmonton
责任者: Carder, DR,Barker, KJ,Easton, MR
关键词: not available
学科分类: 隧道工程
摘要: Field instrumentation was installed to investigate the performance of the diaphragm walls of Fore Street Tunnel at Edmonton. The tunnel was founded in over-consolidated clay and constructed top down with an integral roof and carriageway prop slab. Field observations of wall movements and bending moments, loads and moments in the props, and vertical streses in the clay beneath the carriageway prop slab were taken at the various construction stages. The measured values were compared with those predicted from finite element analysis using a soil model based on the Mohr-Coulomb yield criterion. The measured and predicted loads and moments in the structural members were also compared with those which would be determined using current design procedures. (A)
出版机构: Transport Research Laboratory
提交日期: 1 January 1999
总页数: 26
报告类型: 科技报告
资源类型: 科技(咨询、行业)报告
初始创建时间: 1 January 1999
检索历史
应用推荐