当前位置: 首页> 国外交通期刊数据库 >详情
原文传递 ANALYTICAL DETERMINATION OF CAPACITY OF PILE USING BASE GROUTING WITH A CASE STUDY
题名: ANALYTICAL DETERMINATION OF CAPACITY OF PILE USING BASE GROUTING WITH A CASE STUDY
其他题名: 1.American Association of State Highway and Transportation Officials(AASHTO.)1999,LRFD Bridge Design Specifications,SI,1 st Ed.,Washington,D.C.
正文语种: 英文
作者: Swapan Kr Bagui
关键词: routing;diameter;correlation;improve;settlement;presence;present;pile;design;long
摘要: Base grouting is used successfully worldwide for large diameter and long length piles. In India, Extra dose bridges and Cable Stayed Bridges are becoming popular presently. Therefore, long pile with large diameter is required for Extra dose/Cable Stayed Structures. Bottom cleaning is generally a common problem for long pile and it is found from pile load test of long pile that actual pile capacity is lesser than that of design capacity with large settlement of pile due to insufficient bottom cleaning and presence of slurry mud and soft material from caving. Pile capacity improvement that could be derived from post grouting drilled shaft tips has resulted in a design methodology. This paper discusses the post grouting process and design procedure for the improvement of pile capacity. Correlations between applied grout pressure and end bearing improvement are presented along with a case study with economics of using base grouting provision.
出版年: 2018
论文唯一标识: I-75Y2018V46N05004
英文栏目名称: Technical Papers
期刊名称: Indian Highways
拼音刊名(出版物代码): I-75
卷: 46
期: 05
页码: 13-17
检索历史
应用推荐