当前位置: 首页> 国外交通期刊数据库 >详情
原文传递 DELIVERING OLMSTED LOCKS AND DAM
题名: DELIVERING OLMSTED LOCKS AND DAM
正文语种: 英文
作者: DEWEY RISSLERR P.E., M.ASCE. PMP
关键词: components;tolerance;extreme;structure;rational;operation;illinois;install;enabled;between
摘要: Since becoming operational in summer 2018, the $3-billion Olmsted Locks and Dam on the Ohio River between Illinois and Kentucky has enabled more efficient commercial navigation, helping keep merica's water highways moving. As part of the herculean effort to construct the dam in the wet, the U.S. Army Corps of Engineers and its partners designed and built the structure's massive precast-concrete components onshore, moved them to their required locations, and installed them within extremely tight tolerances.
出版年: 2019
期刊名称: Civil Engineer
期: 6
页码: 74-79
检索历史
应用推荐