原文传递 Assessing and improving safety in existing road tunnels
题名: Assessing and improving safety in existing road tunnels
责任者: Comité technique AIPCR C.4 Exploitation des tunnels routiers / PIARC Technical Committee C.4 Road Tunnel Operation
关键词: not available
学科分类: 公路运输
摘要: This report provides guidelines for a step-by-step process for the development of a safety upgrade programme for existing road tunnels, ensuring that the required safety levels are achieved. The report represents the work of PIARC Technical Committee C.4, Working group 2. A five step methodology is proposed for the development of safety upgrade works: Step 1: "establish a safety framework" to confirm or to prescribe the regulatory framework applicable to the existing tunnel in terms of safety. Safety objectives are defined at this stage. Step 2: "investigate current condition" to obtain a clear view of the current situation. Step 3: "evaluate current tunnel safety level" in order to determine the existing level of tunnel safety. Step 4: "define a safety improvement programme" specific to the existing tunnel and focussed on the deficiencies identified in previous steps. Step 5: "evaluate future tunnel safety level" after the works; to demonstrate the safety benefits obtained through refurbishment works. The presentation of this structured methodology is complemented in appendices with examples of the identification of weak spots for existing tunnels and of case studies of tunnel safety improvement programmes.
出版机构: 世界道路协会(PIARC)
总页数: 63
报告类型: 科技报告
资源类型: 科技(咨询、行业)报告
初始创建时间: 2012
检索历史
应用推荐