题名: |
HIGH-PERFORMANCE CONCRETE: NORTH CAROLINA FIELD INSTALLATION RESULTS. |
作者: |
Leming-ML; Schemmel-JJ; Zia-P; Ahmad-SH |
关键词: |
STRATEGIC-HIGHWAY-RESEARCH-PROGRAM; NORTH-CAROLINA; HIGH-PERFORMANCE-CONCRETES; FIELD-TESTS; TEST-RESULTS |
摘要: |
A Strategic Highway Research Program contract included five installations in five states. The objectives of the field installations were to confirm the ability to produce and place certain high-performance concretes and to achieve desired strength-time targets under realistic conditions, with several sources of raw materials. Data obtained from the most extensive field trials, conducted in North Carolina, are presented and examined. |
总页数: |
Transportation Research Record. 1993. (1382) pp78-81 (1 Fig., 2 Tab.) |
报告类型: |
科技报告 |