题名: |
ANATOMY OF STEEL BRIDGE HEAT-STRAIGHTENING PROJECT. |
作者: |
Avent-RR; Brakke-BL |
关键词: |
GIRDERS-; STEEL-BRIDGES; REPAIRS-; HEAT-STRAIGHTENING; DOCUMENTATION-; IOWA-; STATE-TRANSPORTATION-DEPARTMENT; MAINTENANCE-PERSONNEL; PERSONNEL-TRAINING |
摘要: |
Heat-straightening repair of damaged steel girders has been conducted on a number of bridges over the years. However, little documentation is available on repair methodology and response to such repairs. Such documentation for the field repair of a bridge in Iowa is provided. The Iowa Department of Transportation (IDOT) decided to train its maintenance personnel to perform heat-straightening repairs. The training program consisted of 2 days of classroom and laboratory tutorial training and a field heat-straightening project. The field project was a bridge spanning I-80 near Davenport. The repair was successfully completed and demonstrated the practicality of implementing recent advances in heat-straightening research. The response of the damaged girder to the heat-straightening process was also measured and compared with theoretical models. |
总页数: |
Transportation Research Record. 1996. (1561) pp26-36 (2 Phot., 10 Fig., 3 Tab., 3 Ref.) |
报告类型: |
科技报告 |