原文传递 ANATOMY OF STEEL BRIDGE HEAT-STRAIGHTENING PROJECT.
题名: ANATOMY OF STEEL BRIDGE HEAT-STRAIGHTENING PROJECT.
作者: Avent-RR; Brakke-BL
关键词: GIRDERS-; STEEL-BRIDGES; REPAIRS-; HEAT-STRAIGHTENING; DOCUMENTATION-; IOWA-; STATE-TRANSPORTATION-DEPARTMENT; MAINTENANCE-PERSONNEL; PERSONNEL-TRAINING
摘要: Heat-straightening repair of damaged steel girders has been conducted on a number of bridges over the years. However, little documentation is available on repair methodology and response to such repairs. Such documentation for the field repair of a bridge in Iowa is provided. The Iowa Department of Transportation (IDOT) decided to train its maintenance personnel to perform heat-straightening repairs. The training program consisted of 2 days of classroom and laboratory tutorial training and a field heat-straightening project. The field project was a bridge spanning I-80 near Davenport. The repair was successfully completed and demonstrated the practicality of implementing recent advances in heat-straightening research. The response of the damaged girder to the heat-straightening process was also measured and compared with theoretical models.
总页数: Transportation Research Record. 1996. (1561) pp26-36 (2 Phot., 10 Fig., 3 Tab., 3 Ref.)
报告类型: 科技报告
检索历史
应用推荐