题名: |
7TH NATIONAL CONFERENCE ON HIGH-OCCUPANCY VEHICLE SYSTEMS - PART 1 - PLENARY SESSIONS. HOV SYSTEM OPERATIONS AND PLANS FOR THE BAY AREA. |
作者: |
Seriani-HD; Turnbull-KF (Editor); Hubbard-SM (Editor) |
关键词: |
CONFERENCES-; HIGH-OCCUPANCY-VEHICLE-LANES; PARK-AND-RIDE; SAN-FRANCISCO-BAY-AREA |
摘要: |
High occupancy vehicle (HOV) facilities in the San Francisco Bay area are discussed. The Bay area consists of nine counties (Caltrans District 4), with approximately 155 lane-miles of HOV lanes in operation and another 65 lane-miles under construction. Some 12 lane-miles of the existing HOV lanes are being modified. In addition, about 78 lane-miles are programmed within the next five years. All of the HOV lanes in District 4 are contiguous lanes with no buffers between the HOV lane and the mixed flow lanes. The lanes revert to general purpose use during the non-peak hours. Forty-one park-and-ride lots are in operation in the Bay area. A study is underway to examine the usage of existing lots and the need for future facilities. |
总页数: |
Conference Title: 7th National Conference on High-Occupancy Vehicle Systems - HOV Systems in a New Light. Location: Los Angeles, California. Sponsored by: Transportation Research Board |
报告类型: |
科技报告 |