原文传递 ELECTROCHEMICAL CHLORIDE REMOVAL AND PROTECTION OF CONCRETE BRIDGE COMPONENTS: LABORATORY STUDIES.
题名: ELECTROCHEMICAL CHLORIDE REMOVAL AND PROTECTION OF CONCRETE BRIDGE COMPONENTS: LABORATORY STUDIES.
作者: Bennet-J; Schue-TJ; Clear-KC; Lankard-DL; Hartt-WH; Swiat-WJ
关键词: CHLORIDES-; CONCRETE-BRIDGES; REINFORCING-STEEL; ELECTROCHEMICAL-PROCESSES; STRATEGIC-HIGHWAY-RESEARCH-PROGRAM
摘要: The feasibility of electrochemical chloride removal and concurrent protection as a rehabilitation option for concrete bridge structures was investigated. Chloride removal process procedures were developed, and the effects of the process on structure concrete integrity and reinforcing steel were studied. This report discusses the laboratory evaluations of this process.
总页数: 1993/06. pp201 (Figs., Tabs., Refs., 2 App.)
报告类型: 科技报告
检索历史
应用推荐