原文传递 Summary of Mayday Initiatives. Rural Mayday 1800 Call-In System Feasibility Project No. 19
题名: Summary of Mayday Initiatives. Rural Mayday 1800 Call-In System Feasibility Project No. 19
关键词: Emergency reporting systems; Vehicle loaction; Rural areas; Urban areas; Communication networks; Accidents; Implementation; Funds; United States; User needs; Transportation research; Operational tests
摘要: This document contains task 2 of the stated scope for the l-95 Corridor Coalition - Project No. 19,Rural Mayday/800 Call-in System Feasibility, which is a review of existing and planned Mayday programs. The report summarizes eight operational Tests and seven Private Mayday Programs and technologies. Each summary begins with highlights of information relative to each operational test and technology. These consist of location, scope, cost, type of technology, status, time frame, and contact names associated with each operational test/technology. Included in individual summaries are semi-technical descriptions of the operational test and the technologies associated with these tests.The cost for the Public Operational Tests indicates the total cost allocated towards the project, whereas the cost for the Private Mayday initiatives indicates the cost to the user. The Private Mayday technologies are potentially powerful tools in a Mayday system. The information in this document was compiled from information obtained by contacting relevant individuals directly involved with each operational test and product.This document is an all-inclusive list of the most complete information available to date and the Center for Transportation Research recognizes that this is a living document and information may be added or modified over time. Later deliverables will include analyses of enabling technologies related to possible Mayday implementations and a comparative assessment of the summarized tests.
总页数: 60p
报告类型: 科技报告
检索历史
应用推荐