原文传递 Project No. 3 (95-003). Surveillance Requirements/Technology. Final Project Report
题名: Project No. 3 (95-003). Surveillance Requirements/Technology. Final Project Report
关键词: Traffic surveillance; Traffic management; State-of-the-art; Transportation planning; Vehicle detectors; Systems analysis
摘要: The purpose of this Surveillance Requirements/Technology (SR/T) Project is to develop an implementation plan for the I-95 Corridor-wide traffic and environmental surveillance system using state-of-the-art and cost effective technologies. To fulfill this purpose, the objectives of the Project are: identify the primary goals of the Corridor-wide Surveillance System understand the level and the type of surveillance currently available in the Corridor, understand current state-of-the-art surveillance technologies, develop the Corridor-wide surveillance system requirements and conceptual design, estimate the system's cost based on the conceptual system design, and identify potential Field Operational Tests (FOT) for Phase II. This report summarizes the SR/T Project conducted for the I-95 Corridor Coalition over an 8-month period from September 1994 through May 1995.
总页数: 701p
报告类型: 科技报告
相关文献
检索历史
应用推荐