题名: |
FINNISH PROJECT LEVEL BRIDGE MANAGEMENT SYSTEM. |
作者: |
Soderqvist-M-K; Veijola-M |
关键词: |
Bridge-management-systems; Finland-; Planning-; Reconstruction-; Rehabilitation-Maintenance |
摘要: |
The Finnish Bridge Management System (BMS) consists of two different parts: the Network Level BMS and the Project Level BMS. The Project Level BMS, which deals primarily with individual bridges, uses the recommendations and goals from the network level to decide on the repair measures in individual repair projects to create repair and reconstruction programs. The project level system is the key tool for everyday bridge repair planning in the road districts. The system helps the bridge engineer to plan and schedule the repair projects for individual bridges based on the recommendations and the damage data in the database. The system works with repair and reconstruction programs. In connection to these programs different alternative studies and profitability calculations can be made. For example, analyses concerning bridge structural parts and bridge remnant life will be available. A ranking system is used when picking out the bridges which need either repair and rehabilitation or reconstruction measures. An index describing the repair needs of individual bridges was taken in use for the purpose of arranging the bridges in an urgency order in the work program. This repair index is a function of bridge structural part's estimated condition, damage class and the repair urgency class. The program is prepared so that the condition target can be reached by following the given repair recommendations. |
总页数: |
Conference Title: Eighth International Bridge Management Conference. Location: Denver, Colorado. Sponsored by: Transportation Research Board Committee on Bridge Maintenance and Management (A3C06). Held: 19990426-19990428. Transportation Research Circular |
报告类型: |
科技报告 |