题名: |
NUDECK - A NEW PRESTRESSED STAY-IN-PLACE CONCRETE PANEL FOR BRIDGE DECKS. |
作者: |
Badie-SS; Baishya-MC; Tadros-MK; Brink-M (Editor) |
关键词: |
BRIDGE-DECKS; PANELS-; PRECAST-CONCRETE; PRESTRESSED-CONCRETE; STAY-IN-PLACE |
摘要: |
An improved stay-in-place (SIP) precast prestressed concrete panel system is presented. This system eliminates the major drawbacks of conventional stay-in-place precast panels and still maintains their structural and economical efficiencies. The proposed precast panel covers the entire width of a bridge. Therefore, it eliminates the necessity of forming for the overhangs and results in reduction of the time and labor required installing a larger number of individual panels between girder lines. The panel has a full-length gap at the girder lines to maximize the space needed to accommodate the shear connectors of the supporting girders. The precast panel is continuous over the girder with an innovative reinforcement system. Shear keys and reinforced pockets are used in the direction of traffic to provide continuity between panels. Testing shows that the proposed system has superior structural performance to the conventional SIP panel system. All materials used in the production of the panel are non-proprietary and readily available. This makes this system cost competitive with that of the conventional SIP precast deck system. Details of the system, including design procedure, construction steps and experimental verification, are given. |
总页数: |
Conference Title: Crossroads 2000. Location: Ames, Iowa. Sponsored by: Iowa State Univiersity and Iowa Department of Transportation. Held: 19980819-19980820. 1998. pp45-50 (12 Fig., 7 Ref.) |
报告类型: |
科技报告 |