题名: |
OREGON DOT'S PHASE 2 TRANSPORT ADVANCED TRANSPORTATION MANAGEMENT SYSTEM : REQUIREMENTS MANAGEMENT IN ACTION. |
作者: |
Mitchell-Dennis-J; Churchill-Bruce-W |
关键词: |
Advanced-traffic-management-systems; Freeway-management-systems; Ramp-metering; Traffic-control-centers |
摘要: |
Building on the successful "port" of the Georgia NaviGAtor Advanced Transportation Management System (ATMS), the Oregon Department of Transportation (ODOT) has embarked on an ambitious project to upgrade its TransPort ATMS with advanced "Phase 2" applications in the Region 1 Transportation Management and Operations Center (TMOC) in Portland. These applications are referred to as High Level Objectives and include the integration of Automatic Vehicle Location, Alphanumeric Paging and System Wide Adaptive Ramp Metering, and the improvement of existing ramp metering and incident management operations. Phase 2 also includes the establishment of a viable software development environment for future upgrades. These High Level Objectives are being applied to the baseline ATMS to meet the operational needs of Region 1 and to upgrade the real-time data feeds from ATMS to the award-winning statewide TripCheck web site. Two recent additions to the High Level Objectives are to integrated bus probe speed data from the Tri-Met transit management system and to convert CMS sign drivers to an NTCIP specification. |
总页数: |
ITS America. Meeting (12th : 2002 : Long Beach, Calif.). Securing our future : ITS America 12th Annual Meeting and Exposition 2002 : conference proceedings. 2002. pp9 |
报告类型: |
科技报告 |