原文传递 Methods to Reduce Built-in Residual Stresses in Steel Bridge Diaphragms (Phase I); Physical research rept. (Final) Mar 94-Dec 99
题名: Methods to Reduce Built-in Residual Stresses in Steel Bridge Diaphragms (Phase I); Physical research rept. (Final) Mar 94-Dec 99
作者: South, J. M.; Hahin, C.
关键词: Steel bridges; Residual stresses; Reinforcing steels; Construction; Concrete durability; Strain gages; Aluminum alloys; Diaphragms; Girder bridges; Structural analysis; Elastomers; Maintenance; Bridge decks; Abutments; Bridge piers
摘要: This investigation determined the magnitude and origin of residual stresses in plate girders, diaphragms and stiffeners built-in during construction. Residual stresses can contribute to crack formation. Three different steel bridges were studied: (1) a multi-girder bridge anchored at the abutments with no center pier; (2) a 4-span continuous multi-girder bridge with piers; (3) a movable, double-leaf bascule bridge. Bridges were instrumented with strain gages at the fabricator. Changes in reference strains were monitored: (1) after steel erection and bolt-up; (2) after deck placement; and (3) after parapet placement.
总页数: 102p
报告类型: 科技报告
检索历史
应用推荐