原文传递 Truck Route Access Evaluation, Industrial Park, Henderson County, Site No. 2. Freight Movement and Intermodal Access in Kentucky
题名: Truck Route Access Evaluation, Industrial Park, Henderson County, Site No. 2. Freight Movement and Intermodal Access in Kentucky
作者: Agent, K. R.; Aldridge, B.; Aultman-Hall, L.; Cain, D.; Stamatiadis, N.
关键词: Freight transportation; Intermodal transportation systems; Truck rates; Kentucky; Trucking industry; Data collection; Recommendations; Accessibility; Cargo transportation; Accidents
摘要: The Freight Movement and Intermodal Access in Kentucky Study (SPR 98-189) is being conducted on behalf of the Kentucky Transportation Cabinet (KYTC). There are two major objectives of the study: evaluation of the access for trucks between intermodal or other truck generating sites and the National Highway System (NHS); and furthering the understanding of freight commodity flows throughout the state. This report summarizes the access evaluation for several facilities located in Henderson County in the Green River Area Development District (ADD) and KYTC Highway District No. 2. Work on other specific sites as well as the freight commodity flow task are on-going and are documented elsewhere. The sites to be evaluated were selected from two existing databases (a truck facility survey from 1994 and the intermodal facility inventory) based on ADD and KYTC Highway District planner recommendations, geographic location, distance to the national highway system, and the number of truck accessing the site. Consideration was also made for the freight type handled and transportation modes used. The Henderson County industrial area was recommended by the West Kentucky Corporation.
总页数: 20p
报告类型: 科技报告
检索历史
应用推荐