原文传递 Field Evaluation of Corrosion Inhibitors for Concrete: Interim Report 1. Evaluation of Exposure Slabs Repaired with Corrosion Inhibitors
题名: Field Evaluation of Corrosion Inhibitors for Concrete: Interim Report 1. Evaluation of Exposure Slabs Repaired with Corrosion Inhibitors
作者: Sprinkel, M.; Ozyildirim, C.
关键词: Corrosion inhibitors; Concretes; Bridge decks; Pavement overlays; Slabs; Coverings; Tables(Data)
摘要: One hundred and fifty-six exposure slabs have been constructed with and without a variety of combinations of corrosion inhibiting admixtures and topically applied inhibitors. To accelerate corrosion one hundred and thirty-six of the slabs were constructed with concrete that surrounded the top mat of reinforcement with chloride contents of 3, 6, 10, and 15 lb/cubic yard (1.8, 3.5, 5.9, and 8.9 kg/cu m). This paper presents the results from measurements made on the slabs in 1998.5 after approximately 1 year of exposure. The measurements show that as the chloride ion content in the slabs increases, the macrocell current, macrocell potential, half-cell potential, and rate of corrosion increase and the resistance descreases.
总页数: 60p
报告类型: 科技报告
检索历史
应用推荐