原文传递 Overview of the Quality and Quantity of Roadway Runoff and Current Status of Phase 2 Storm Water Rules; Final rept
题名: Overview of the Quality and Quantity of Roadway Runoff and Current Status of Phase 2 Storm Water Rules; Final rept
作者: Davis, V.; Gross, S.; Lockbaum, M. J.
关键词: Storm water runoff; Water quality; Rainfall-runoff relationships; Highways; Surface runoff; Permits; Storm drains; Drainage; Snowmelt; Water yield; Traffic volume; Regulations; National Pollutant Discharge Elimination System
摘要: This report provides a summary of the current Storm Water rules and proposed rules as they may effect the construction and operation of the streets and highways of Minnesota Cities and Counties. This report also summarizes The Quantity and Quality of Runoff from Selected Guttered and Unguttered Roadways in Northeast Ramsey County, Minnesota (PB97-160105). The rules summarized include the Federal Phase II Storm Water Rules, the Minnesota Pollution Control Agency's response to the proposed rules, and the process of obtaining industrial and Municipal Storm Water Permits and Construction Storm Water Permits.
总页数: 62p
报告类型: 科技报告
检索历史
应用推荐