摘要: |
For years, a highway interchange in Jacksonville, Fla., created constant traffic delays. Because the southbound Interstate 95 (1-95) traffic exited to eastbound State Route 202 (SR-202) at a stoplight, vehicles would back up for a mile or more during rush hour. City leaders finally decided the problem had to be fixed.
In 2014, the owner awarded a design-build contract for the redesign and construction of the interchange to eliminate the congestion. The winning design featured four bridge structures, new ramp configurations, new highway alignments, and roadway widening of both highways. |