当前位置: 首页> 国外交通期刊数据库 >详情
原文传递 Structural integrity of precast concrete modular construction
题名: Structural integrity of precast concrete modular construction
正文语种: eng
作者: Wenke, Jeff M.;Dolan, Charles W.
作者单位: Plan One Architects Cody WY 82414 USA;Univ Wyoming Laramie WY 82071 USA
关键词: Connection;modular construction;structural integrity
摘要: The American Concrete Institute's (ACI's) Building Code Requirements for Structural Concrete (ACI 31819) and Commentary (ACI 318R-19) contains structural integrity provisions for precast concrete panel buildings but does not address the structural integrity of precast concrete modules. ACI 318 requires spaced steel ties in all directions to tie the precast concrete panel elements together. These criteria are impractical for precast concrete modules due to the construction methods and the overall rigidity of each module. Precast concrete modules are inherently stable, even when subjected to General Services Administration criteria for partial removal of structural walls or corners, which require that if a portion of a wall or an entire module is removed, the remaining portions must have sufficient capacity to carry the resulting gravity loads. This paper examines the stress increases due to partial wall removal and the possibility of total module removal. It discusses strength reserves, provides recommendations for future editions of ACI 318 and the PCI Design Handbook: Precast and Prestressed Concrete, and presents conceptual connections that provide the continuity and ductility needed to maintain structural integrity following total module removal.
出版年: 2021
期刊名称: PCI Journal
卷: 66
期: 2
检索历史
应用推荐