原文传递 Testing of New Bridge Rail and Transition Designs. Volume 12: Appendix K. Oregon Transition; Final rept. Aug 86-Sep 93
题名: Testing of New Bridge Rail and Transition Designs. Volume 12: Appendix K. Oregon Transition; Final rept. Aug 86-Sep 93
作者: Buth, C. E.; Hirsch, T. J.; Menges, W. L.
关键词: Bridge parapet design; Impact tests; Ultimate strength method; Highway safety; Guardrail design
摘要: A transition for the Oregon side-mounted thrie-beam bridge railing was developed and tested to performance level one of the 1989 Guide Specifications for Bridge Railings. Acceptable performance of the transition was demonstrated. Post spacing in the transition area is 3 ft-1 1/2 in (953 mm). A 12 ft-6 in (3.81 m) length of thrie-beam which curves behind the guardrail post on the approach end is used in the transition.
总页数: 57p
报告类型: 科技报告