题名: | INDUSTRY VIEW |
正文语种: | eng |
摘要: | At one of the most critical junctures of the I-91 Charter Oak Bridge Project in Hartford, Connecticut, a new two-lane exit ramp will replace a single-lane ramp that has been the source of safety concerns and routine congestion. The double wall at either side of the off-ramp is being built from 438 precast modules running 1,180 linear ft. The walls will be capped with precast parapets. |
出版年: | 2021 |
期刊名称: | Roads & bridges |
卷: | 59 |
期: | 4 |