原文传递 Glen Canyon Bridge (Constructed 1957-1959). Technical Record of Design and Construction; Final rept
题名: Glen Canyon Bridge (Constructed 1957-1959). Technical Record of Design and Construction; Final rept
关键词: Bridge construction; Bridge design; Contracts; Engineering structures; Arizona; Utah; Transportation
摘要: This technical record of design and construction of Glen Canyon Bridge is divided into five chapters. Chapter I is devoted to introduction and investigations. Chapters II and III cover the design; chapter II discusses preliminary studies of arch types and chapter III the final design. Chapter IV covers factual information on the construction contract. A comprehensive narrative of the construction is included in chapter V.
总页数: 175p
报告类型: 科技报告
检索历史
应用推荐