摘要: |
1.New eight-mile dual carriageway and two-mile twin bored tunnel 2.10 miles of new public rights of way, converting much of the existing A303 to a new dedicated route 3.330 acres of new chalk grassland, reuniting the isolated chalk grassland around Stonehenge to Salisbury Plain, and going a long way to joining right across to Porton Down 4.Careful positioning of the route in the WHS along a corridor parallel to the existing A303 to avoid intrusion on the winter solstice sunset alignment viewed from Stonehenge. |