摘要: |
Arecently completed £3.4m scheme on the A1066 saw a section of road surface replaced between Thetford and Diss (pictured above). Routine monitoring showed a rapid deterioration of the surface following the hot summers of 2018 and 2019, which left the busy route very uneven in places.The road runs through rural land and forest with long stretches of straight single lane carriageway with speed limits set at 60mph.SPL was brought in by contractors Tarmac to deliver a recycling treatment that was identified as suitable on this route.As part of the design assessment, extensive investigation and testing were undertaken by Norfolk Partnership Laboratory (NPL) - part of the Norse Group-on behalf of Norfolk County Council. |