摘要: |
For more than 10 years IKO has been supplying its Permatrack materials to numerous projects on the M25 motorway network. Initially used for bridge joint repairs, the solutions have also been employed to refurbish joints between carriageway concrete bays and traditional surfacing using the IKO Permatrack Inlaid Crack Repair system. Close collaboration between manufacturer (IKO), client (Connect Plus) and installing contractor (Techjoint Ltd) has resulted in an excellent working relationship,ensuring long-lasting quality repairs are carried out to the highest of standards. Examples of concrete bay joint repairs on the M25 motorway network are between junctions 8-11 and junctions 27-30. During 2019 and 2020, approximately 3,000 tonnes of IKO Permatrack product was supplied to these contracts, which equates to more than 150,000 linear metres of roadway repairs. |