原文传递 Investigation of Cause of Cracked Stringer on the Blanchette Bridge.
题名: Investigation of Cause of Cracked Stringer on the Blanchette Bridge.
作者: marianos, w. n. chen, g. galati, n. matta, f.
关键词: stringer, finite element analysis, prestressed concrete, beams(supports), destructive tests, flexurial strength, grid deck, fatigue
摘要: The Blanchette Bridge carries Interstate 70 across the Missouri River, connecting St. Louis and St. Charles counties in eastern Missouri. The westbound bridge was constructed in 1958. In 1979, the original reinforced concrete roadway deck on the bridge was replaced with a steel grid deck system, welded to supporting girders and stringers. In 1999 and 2005, cracks were discovered in stringers on the bridge approach spans. The stringers were repaired with bolted splices. The investigation of the cracking included preliminary analyses, review of historical documents, detailed finite element analyses, and field testing of the bridge. The cracking was determined to result from the field weld detail used combined with the load distribution effects of the stiff grid deck. Recommended mitigation measures are included. / Supplementary Notes: Sponsored by Federal Highway Administration, Jefferson City, MO. Missouri Div. / Availability Note: Order this product from NTIS by: phone at 1-800-553-NTIS (U.S. customers); (703)605-6000 (other countries); fax at (703)605-6900; and email at orders@ntis.gov. NTIS is located at 5285 Port Royal Road, Springfield, VA, 22161, USA.
总页数: u0711;54p
报告类型: 科技报告
检索历史
应用推荐