原文传递 Design/Build versus Traditional Construction User Delay Modeling: An Evaluation of the Cost Effectiveness of Innovative Construction Methods for New Construction. Part 1. I-15 Reconstruction in Davis County. Evaluation of Various Traffic Maintenance Plans
题名: Design/Build versus Traditional Construction User Delay Modeling: An Evaluation of the Cost Effectiveness of Innovative Construction Methods for New Construction. Part 1. I-15 Reconstruction in Davis County. Evaluation of Various Traffic Maintenance Plans
作者: martin, p. t. stevanovic, a.
关键词: closure scenarios, ogden area (utah)
摘要: This paper evaluates impact of various I-15 reconstruction closure scenarios on the travelers in Ogden area. The purpose of the research was to investigate impact of the scenarios and facilitate decision about future maintenance of traffic during the reconstruction. The original Wasatch Front Regional Council (WFRC) transportation planning model was converted from the TP+ software to the VISUM software. The VISUM model of the whole WFRC area was then calibrated and validated. Coefficient of determination between modeled and observed traffic volumes was 0.78. The model was then reduced, by partial network generation process in VISIM, to the Ogden area. Another set of calibration and validation was performed. The coefficient of determination has improved to 0.88. Twenty one reconstruction closure scenarios were developed in consultation with UDOT project managers. Traffic assignments were executed for each scenario for five diurnal periods. / Supplementary Notes: See also Part 2, PB2007-111451. Sponsored by Department of Transportation, Washington, DC. University Transportation Centers Program. / Availability Note: Product reproduced from digital image. Order this product from NTIS by: phone at 1-800-553-NTIS (U.S. customers); (703)605-6000 (other countries); fax at (703)605-6900; and email at orders@ntis.gov. NTIS is located at 5285 Port Royal Road, Springfield, VA, 22161, USA.
总页数: u0723;56p
报告类型: 科技报告
相关文献
检索历史
应用推荐