题名: |
Improving Naval Shipbuilding Project Efficiency through Rework Reduction. |
作者: |
clark, d. l. howell, d. m. wilson, c. e. |
关键词: |
acquisition, costs, naval architecture, systems approach, theses, modification |
摘要: |
The rising cost of U.S. Naval Ships and the rate of change in technology require a thorough analysis of current shipbuilding practices. The Navy wants the latest and greatest technology, while at the same time keeping overall cost low. Some technologies are obsolete before completion of the ship's design and construction. A design locked in at Critical Design Review (CDR) undergoes multiple modifications prior to ship's delivery. Design changes drive up cost. The goal is to provide the Warfighter Battlespace Dominance while keeping cost low enough to allow a consistent purchase of additional ships. To accomplish this goal, both industry and the Navy must be aware of what is driving design changes and willing to revise existing practices. The objectives of this thesis are to identify the major sources of rework and to suggest modifications and improvements to existing practices. A review of DoD Acquisition and the Shipbuilding process identifies design changes resulting from requirements volatility, inconsistent execution of Defense Acquisition, and the rigidity of the design and construction process as major sources of rework. Recommendations include improving change management, optimizing the schedule for resilience, and the use of a modular open systems approach to reduce rework. / NOTE: Master's thesis. / Supplementary Notes: The original document contains color images. / Availability Note: Order this product from NTIS by: phone at 1-800-553-NTIS (U.S. customers); (703)605-6000 (other countries); fax at (703)605-6900; and email at orders@ntis.gov. NTIS is located at 5285 Port Royal Road, Springfield, VA, 22161, USA. |
总页数: |
u0805;137p |
报告类型: |
科技报告 |