摘要: |
This is the Final report arising from co-operation between ERDC and HR Wallingford on the research of turbidity caused by dredging. It covers the period April 2001 April 2003 with some additional information up to 1 August 2003. Details of the work are described in a series of 7 Interim Reports. The work carried out over the two-year contract period consisted of: 1) Six co- operation meetings held alternately in Europe and in the USA. 2) Protocols for measurements, internationally reviewed and finally released on 1 August 2003. 3) Disaggregation Index study by WL Delft Hydraulics. 4) CFX Modelling. 5) Field Trial 1: grab dredger on R Tees. Field Trial 2: trailing suction hopper dredger at Rotterdam. An upgrade for TASS Two papers were produced and presented at conferences and are included as appendixes in this report. / NOTE: Final rept. Apr 2001-Apr 2003. / Supplementary Notes: The original document contains color images. / Availability Note: Product reproduced from digital image. Order this product from NTIS by: phone at 1-800-553-NTIS (U.S. customers); (703)605-6000 (other countries); fax at (703)605-6900; and email at orders@ntis.gov. NTIS is located at 5285 Port Royal Road, Springfield, VA, 22161, USA. |