原文传递 Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress.
题名: Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress.
作者: o'rourke, r.
关键词: cost estimates, ballistic missile submarines, cruisers, amphibious ships, destroyers, naval vessels(support), history, frigates, legislation, attack submarines, aircraft carriers
摘要: In February 2006, the Navy proposed a future ship force structure of 313 ships, including, among other things, 14 ballistic missile submarines (SSBNs), 11 (and eventually 12) aircraft carriers, 48 attack submarines (SSNs), 88 cruisers and destroyers, 55 Littoral Combat Ships (LCSs), 31 amphibious ships, and a Maritime Prepositioning Force (Future), or MPF(F), squadron with 12 new-construction amphibious and sealift-type ships. In February 2007, the Navy submitted a 6-year (FY2008-FY2013) shipbuilding plan and a 30-year (FY2008- FY2037) shipbuilding plan. The final report on the 2005 Quadrennial Defense Review supported a fleet of more than 281 ships, including 11 carriers, but did not explicitly endorse a 313-ship fleet including the numbers that the Navy has outlined for other types of ships. Regarding the 313-ship proposal, some observers have questioned the Navy's planned figures for amphibious ships and SSNs, and have suggested that a fleet with 33 amphibious ships and more than 48 SSNs would be more appropriate. The Navy's 30-year shipbuilding plan does not include enough ships to fully support all elements of the 313-ship fleet consistently over the long run. Deficiencies in the 30-year shipbuilding plan relative to the 313-ship fleet include 1 amphibious ship, 4 cruise missile submarines (SSGNs), 8 SSNs, and about 10 cruisers and destroyers. The Navy says that for its shipbuilding plans to be affordable and executable, the Navy needs to be funded at a certain overall level, control certain nonshipbuilding expenditures, and build ships within estimated costs. With regard to the last of these items, the Congressional Budget Office estimates that shipbuilding costs will be about 34% higher than the Navy estimates. If the Navy cannot meet its goals regarding its overall level funding, non-shipbuilding expenditures, and shipbuilding costs, the Navy's shipbuilding plans may become difficult or impossible to execute, particularly after FY2011. / NOTE: Congressional rept. / Supplementary Notes: CRS Report for Congress. / Availability Note: Product reproduced from digital image. Order this product from NTIS by: phone at 1-800-553-NTIS (U.S. customers); (703)605-6000 (other countries); fax at (703)605-6900; and email at orders@ntis.gov. NTIS is located at 5285 Port Royal Road, Springfield, VA, 22161, USA.
总页数: u0724;33p
报告类型: 科技报告
检索历史
应用推荐