摘要: |
This report summarizes analysis of Oregon Department of Transportation (ODOT) methods of insourced and outsourced project delivery using data obtained from ODOT reporting systems, ratings of project effectiveness by ODOT Area Managers and by construction contractors, and interviews with ODOT Area Managers and managers from engineering consulting firms that ODOT uses for outsourced design-bid-build projects. Results of a literature review and DOT survey were published in an interim report in December 2003. Guidelines, including a decision tree, are provided for assignment of projects for insourced design-bid-build, outsourced design-bid-build, or design-build delivery. / NOTE: Final rept. / Supplementary Notes: Supersedes PB2004-101923. Sponsored by Oregon Dept. of Transportation, Salem. Research Unit. and Federal Highway Administration, Washington, DC. / Availability Note: Product reproduced from digital image. Order this product from NTIS by: phone at 1-800-553-NTIS (U.S. customers); (703)605-6000 (other countries); fax at (703)605-6900; and email at orders@ntis.gov. NTIS is located at 5285 Port Royal Road, Springfield, VA, 22161, USA. |