原文传递 Traffic Monitor Trailers, Configuration and Deployment. Final Report.
题名: Traffic Monitor Trailers, Configuration and Deployment. Final Report.
作者: hayden, l.
关键词: traffic flow, project focus, integration issues, possible solutions, recommendations
摘要: The Western Transportation Institute (WTI) Trailer Configuration and Deployment Project was created by a desire to improve Bozeman traffic flow, particularly during campus events. This document is divided into five main sections; Introduction, Design, Assembly, Recommendations, and Quick Users Guide. The Introduction section describes the impetus and focus of the project. The Design section details the integration issues encountered, possible solutions, reasons for the option(s) chosen, and notes on the results. The Assembly section provides details for all connection and setup issues. The Recommendation section provides insight for building an optimal mobile traffic monitoring system from scratch. Finally, the Quick Users Guide provides instructions to successfully deploy the trailers. / Supplementary Notes: Sponsored by Department of Transportation, Washington, DC. Research & Innovative Technology Administration (RITA). / Availability Note: Order this product from NTIS by: phone at 1-800-553-NTIS (U.S. customers); (703)605-6000 (other countries); fax at (703)605-6900; and email at orders@ntis.gov. NTIS is located at 5285 Port Royal Road, Springfield, VA, 22161, USA.
总页数: u0802;66p
报告类型: 科技报告
检索历史
应用推荐