项目名称: |
WORKING OUT A METHODOLOGY FOR UNDERTAKING COST BENEFIT STUDIES FOR THE USE OF TRAFFIC SIGNAL FACILITIES; STAGE 1 |
摘要: |
THE OBJECT IS TO DETERMINE THE COSTS AND BENEFITS ASSOCIATED WITH THE INSTALLATION AND OPERATION OF TRAFFIC SIGNALS, AS A FIRST STAGE IN THE WORKING OUT OF A SIMPLE METHOD TO HANDLE PROCEDURE TO ENABLE THE TRAFFIC ENGINEER, FACED WITH A DECISION ON THE INSTALLATION OF TRAFFIC SIGNALS, TO FIND THE BEST SOLUTION IN ACCORDANCE WITH COST BENEFIT CRITERIA. THE FURTHER PROGRAMME OF WORK ANTICIPATED FOR STAGE 2 - WORKING OUT OF METHODOLOGY - IS TO BE CHECKED AND POSSIBLY MODIFIED AFTER CONCLUSION OF THE FIRST STAGE. TO GUARANTEE AS PRACTICAL WORKING AS POSSIBLE, IT IS INTENDED TO CARRY OUT THE STUDY IN CLOSE CONTACT WITH THE TRAFFIC ENGINEERING DIVISION OF THE ROAD CONSTRUCTION OFFICE IN COLOGNE. |
状态: |
Completed |
资助组织: |
BUNDESMINISTER FUER VERKEHR (FEDERAL MINISTER OF TRANSPORT) |
项目负责人: |
RUETH, A;JORDANS, B |
执行机构: |
INGENIEURBUERO F. H. KOCKS KG (F. H. KOCKS, CONSULTING ENGINEERS) |
开始时间: |
19780800 |
实际结束时间: |
19790500 |
主题领域: |
Research;I10: Economics and Administration;I73: Traffic Control |