项目名称: |
EFFECTIVE METHODS AND EQUIPMENT FOR COMPACTING EMBANKMENT SLOPES AND EMBANKMENT SHOULDERS |
摘要: |
THE CONSTRUCTION OF MAIN ROADS IN THE CENTRAL MOUNTAIN AREA INVOLVES CONSIDERABLE EARTHWORKS. WHEN THERE IS A GREAT VARIETY OF SOIL AND ROCK IT IS NECESSARY FOR ECONOMIC REASONS TO USE LARGE VOLUME LOADING EQUIPMENT AND REAR-DUMP-TRUCKS. THE HEIGHTS OF THE FILLS ARE SOMETIMES OVER 2 M. THESE CONDITIONS CAUSE COMPLICATIONS IN EARTHWORKS AND COMPACTION, PARTICULARLY NEAR SLOPES. THE OBJECT OF THE RESEARCH IS TO STUDY THE CAPACITY OF THE COMPACTION EQUIPMENT USED AND THE COSTS OF REPAIRING DEFECTIVE AREAS. |
状态: |
Active |
资助组织: |
BUNDESMINISTER FUER VERKEHR |
项目负责人: |
- |
执行机构: |
UNIV. (TH) KARLSRUHE, INST. F. MASCHINENWESEN IM BAUBETRIEB (TECHNICAL UNIVERSITY OF KARLSRUHE, INSTITUTE OF CONSTRUCTION PLANT) |
开始时间: |
19780100 |
预计完成日期: |
19790600 |
主题领域: |
Geotechnology;Research;I51: Earthworks and Soil Drainage |