MEASUREMENTS ON CONCRETE PAVEMENTS HAVING HEAT-INSULATING AND STABILISED HYDRAULICALLY BOUND BASES
项目名称: MEASUREMENTS ON CONCRETE PAVEMENTS HAVING HEAT-INSULATING AND STABILISED HYDRAULICALLY BOUND BASES
摘要: PART OF THE RECONSTRUCTION OF THE A81 MOTORWAY BETWEEN WEINSBERG AND WUERSBURG INCLUDED THE INCORPORATION OF TWO EXPERIMENTAL SECTIONS, EACH 1.5 KM LONG, HAVING HEAT-INSULATING COURSES AND/OR STRENGTHENED HYDRAULICALLY BOUND GRAVEL ROADBASES UNDER CONCRETE SURFACINGS. IN A PREVIOUS PROJECT MEASUREMENTS OF TEMPERATURE, JOINTS AND SETTLEMENTS WERE MADE ON THIS SUPPORTING SYSTEM AND ALSO ON ANOTHER SECTION HAVING A CONVENTIONAL FROST BLANKET. A COMPARISON OF THE DEFLECTION LINES OF THE CONCRETE SURFACING IN THE MIDDLE OF THE SLAB SHOWS THAT SETTLEMENT UNDER THE REAR AXLE OF A HEAVY VEHICLE BEFORE THE ROAD WAS OPENED TO TRAFFIC AND ONE YEAR AFTERWARDS HAD NOT CHANGED. AS THE BONDING ACTION BETWEEN THE CONCRETE SURFACING AND THE ROADBASE LEADS TO A NOTABLE DECREASE IN THE STRESS AND THUS TO AN INCREASE IN THE LIFE OF THE SUPPORTING SYSTEM, TESTS ARE TO BE CARRIED OUT AFTER A PERIOD OF SEVERAL YEARS, IN WHICH THERE HAVE BEEN MANY TEMPERATURE AND TRAFFIC LOADING EFFECTS, TO SEE WHETHER A CHANGE IN THE BONDING ACTION HAS OCCURRED. THE TESTS WILL INCLUDE A REPETITION OF THE SETTLEMENT MEASUREMENTS IN THE CENTRE OF THE SLAB AND AT THE EDGE OF THE JOINTS, AND A CONTINUATION OF THE JOINT AND TEMPERATURE MEASUREMENTS AS THE WINTERS OF 1974/5 AND 1975/6 WERE VERY MILD AND FROST ACTION WAS RELATIVELY SLIGHT.
状态: Completed
资助组织: BUNDESMINISTER FUER VERKEHR
项目负责人: BIRMANN, D;EISENMANN, J
执行机构: PRUEFAMT F D BAU V LANDVERKEHRSWEGEN, TU MUENCHEN (TECHNICAL UNIVERSITY OF MUNICH, INSTITUTE FOR CONSTRUCTION OF LAND TRANSPORT ROUTES)
开始时间: 19761200
实际结束时间: 19790100
主题领域: Research;I22: Design of Pavements, Railways and Guideways;I52: Construction of Pavements and Surfacings