PERMANENT AUSCULTATION OF THE ROCK AND CUTTINGS FOR THE LAYOUT OF THE ACCESSES TO THE EL CADI TUNNEL
项目名称: PERMANENT AUSCULTATION OF THE ROCK AND CUTTINGS FOR THE LAYOUT OF THE ACCESSES TO THE EL CADI TUNNEL
摘要: Periodical checking of all the cuttings for the access to the El Cadi tunnel are carried out in order to test the degree of stability in short, medium and long term, with a view to planning specific or general work so as to guarantes safety for the user and the concession. The work is carried out by qualified personnel in the wake of the most severe climatic conditions, specific test samples (glass) and general test samples (photographic control) being installed, in addition to a statistical analysis of the discontinuities and their development in time.
资金: 0.00
项目负责人: ESCOBET Y BONET, J
执行机构: CESA, CADI'S TUNNEL
开始时间: 19870100
实际结束时间: 19980000
主题领域: Safety and Human Factors;I42: Soil Mechanics
检索历史
应用推荐