当前位置: 首页> 交通中文期刊数据库 >详情
原文传递 STATIC BIKE REPOSITIONING AND MAINTENANCE PROBLEM
题名: STATIC BIKE REPOSITIONING AND MAINTENANCE PROBLEM
正文语种: eng
作者: Chin-Sum Shui;
作者单位: 國立陽明交通大學運輸與物流管理學系 新竹市東區大學路1001號國立陽明 交通大學綜合一館8樓814室;
关键词: Bike repositioning; Broken bike maintenance; Bike sharing system; On-site repair
摘要: This paper proposes a new static bike repositioning problem that maintenance operation is simultaneously considered. In this problem, a broken bike at a station can be either collected on the relocation vehicle to be sent back to the depot or repaired on-site to restore its function during repositioning. This on-site repair becomes a new strategy that is examined in this paper and new to the literature. The problem is formulated as a mixed-integer linear programming problem that determines the number of deployed vehicles, the loading and unloading quantities for normal bikes at all stations, and the number of collected and repaired broken bikes at all stations such that the weighted sum of the total service time and the penalties associated with the deviations from the targeted inventory level is minimized. Using the real-world case of Youbike in Taiwan, this paper demonstrates the on-site repair strategy can reduce the repositioning cost and deviations from the target inventory levels more than mere collection strategy. Sensitivity analyses show that the shorter repairing time, larger vehicle, and higher penalty for deviations from the target inventory level can obtain strategies with smaller deviation and shorter travel time. Moreover, a revised problem which includes service time constraint is proposed and the numerical studies show that the increase in allowable service time can reduce the number of deployed vehicles and the total service time.
期刊名称: 运输计划
出版年: 2021
期: 03
页码: 225-252
相关文献
检索历史
应用推荐