题名: | Implementation Document for Rail Classification Yard/Motor Pool Area IRA. Volume 1. General. Volume 2. Specifications. |
关键词: | LOGISTICS SUPPORT, RAIL TRANSPORTATION, RAILS, COST ESTIMATES, WATER, HEALTH, FACILITIES, ALLUVIUM, CONTAINMENT(GENERAL), GROUND WATER, CONSTRUCTION, RESPONSE, PLANNING, TRANSPORT, SAFETY, CLASSIFICATION, PIPELINES, EXTRACTION, MOTORS, CHANNELS. |
摘要: | The interim response action for the rail classification yard/motor pool area will include: (1). Ground water extraction systems in the alluvial channels of the rail yard and motor pool areas. (2). Pipeline to transport the extracted water to the irondale containment system treatment facility. (3). Modifications to the treatment facility to allow for the additional flow. Volume 1 of this implementation document contains: (1). Mou between the army and shell concerning shell's participation in the IRA's. (2). Construction work plan. (3). Cost estimates. (4). Task specific health and safety plan. |
总页数: | 410 |
报告类型: | 科技报告 |