摘要: |
The St. Paul Engineer District, in part-nership with Minnesota's Ramsey County,awarded a $14.7 million contract June 25 to LS Marine Inc. of St. Paul, Minn., to re-store habitat on Pigs Eye Lake, located in upper Pool 2 of the Mississippi River.The project will enhance and restore backwater habitat by creating island and wetland features on Pigs Eye Lake using more than 400,000 cubic yards of material dredged from Pool 2 of the Mississippi River by the Corps during maintenance of the nav-igation channel. The material will be moved about 12 miles, according to Taylor Luke,president of LS Marine, which is headquar-tered in Stillwater, Minn. The contract in-cludes the placement of riprap and willow plantings to protect against erosion.The project features, including island construction with sand benches, marsh habitat restoration and terrestrial planting,are designed to reduce wind and wave ac-tion to improve vegetation, create thermal shelter for waterfowl and protect against shoreline erosion. The total project foot-print will be approximately 40 acres and will provide benefits to more than 600 acres of Pigs Eye Lake and the surrounding habitat.Work is expected to be completed by the end of 2025 with additional monitor-ing and management to follow. |