项目名称: |
RES2023-14: Improved Management Strategies of Processing Acid Producing Materials on Transportation Projects |
摘要: |
Roadway excavation cuts in Tennessee frequently encounter rock,
shale, or soil materials that could be considered acid producing
material (APM). The geotechnical material properties of APM are
adequate for roadway fill, but the APM produces acidic leachate that
creates a condition of environmental pollution.
Tennessee Department of Transportation (TDOT) has prepared a
guidance manual in 2007 for dealing with these types of projects. TDOT
routinely uses these design and construction protocols for proper
handling of APM with APM processing strategies consist of blending
with lime, relocating to landfills, or placement in engineered
encapsulation cells on-site or off-site. These strategies, however, result
in considerable increases in project costs and reductions in
construction productivity, thus driving the need to assess current APM
construction procedures to enhance the management of APM
encountered in TDOT roadway projects with improved cost effectiveness and construction productivity. |
状态: |
Active |
资金: |
200000 |
资助组织: |
Tennessee Department of Transportation |
管理组织: |
Tennessee Department of Transportation |
执行机构: |
University of Tennessee, Knoxville |
主要研究人员: |
He, Quang |
开始时间: |
20220801 |
预计完成日期: |
20250131 |
主题领域: |
Construction;Environment;Geotechnology;Highways;Planning and Forecasting |