项目名称: |
WSDOT Maintenance Performance Measure Algorithm |
摘要: |
The principal objective of this quick response research is to develop an algorithm(s) to predict the performance condition of six highway assets. The algorithm(s) will use a data-driven approach, utilizing historical performance measures. Developing the algorithm(s) gives Washington State DOT Maintenance Division the ability to predict LOS performance data in order to predict trends under differing funding conditions. The six highway assets are: (1) MAP Activity 1A3- Shoulder Maintenance; (2) MAP Activity 2A2- Culverts; (3) MAP Activity 6A7- Barrier Maintenance/Guardrail; (4) MAP Activity 2A1- Ditches; (5) MAP Activity 2A5- Slope Repair; and (6) MAP Activity 6B1- Traffic Signal Systems. |
状态: |
Proposed |
资金: |
50000 |
资助组织: |
Washington State Department of Transportation |
项目负责人: |
Brodin, Doug |
执行机构: |
Washington State University |
主要研究人员: |
Shrestha, Kishor |
开始时间: |
20220401 |
预计完成日期: |
20230630 |
主题领域: |
Highways;Maintenance and Preservation;Planning and Forecasting |