Implementation of Precast Concrete Segments for Electrified Roadway
项目名称: Implementation of Precast Concrete Segments for Electrified Roadway
摘要: A major impediment to broad public acceptance of electric vehicles is their limited travel range. An exciting potential solution to this problem is In-Motion Electric Wireless Power Transfer. This is essential for the development of connected and autonomous vehicles. Durability of the Civil-Electrical Infrastructure has been studied in recent research. The next logical step toward adoption is integration in a successful demonstration project. In order for the future adoption of this technology, roadways will need to be modified to allow the transmission of power to vehicles as they travel. Successful adoption of In-Motion Wireless Power Transfer will require advances in the efficiency of the overall electrical system, improvements in tracking of the actual vehicles, and significant developments in the civil infrastructure. This proposal will address the constructability of coils in a proposed precast system. The stringent electrical specifications will be monitored while utilized in an actual closed loop working system.
状态: Active
资金: 133000
资助组织: Office of the Assistant Secretary for Research and Technology
管理组织: Mountain-Plains Consortium
项目负责人: Kline, Robin
执行机构: Utah State University
主要研究人员: Halling, Marvin
开始时间: 20181019
预计完成日期: 20220731
实际结束时间: 0
检索历史
应用推荐