Implementation of a Variable Speed Limit/Ramp Metering Strategy to Increase Freeway Capacity at Metered On-ramps
项目名称:
Implementation of a Variable Speed Limit/Ramp Metering Strategy to Increase Freeway Capacity at Metered On-ramps
摘要:
The objectives of this project is to perform detailed micro-simulation and fine-tuning of the variable speed limit (VSL) control strategy TORBO at two merge bottleneck in the I-285 corridor, and to produce all the necessary input for its implementation in NaviGAtor. The location will be determined in conjunction with Georgia Department of Transportation (GDOT) and the contractor WSP.