SPR-4320: Implementation of Epoxy Injection of Concrete Overlaid Bridge Decks
项目名称: SPR-4320: Implementation of Epoxy Injection of Concrete Overlaid Bridge Decks
摘要: Concrete overlay has proven to be effective maintenance treatment as it prevents de-icing chemicals and water penetration into the original deck surface. Typically, over time, debonding develops at the boundary between the original deck and overlay which creates void. Displacing water and filling these cracks with epoxy helps eliminate freeze and thaw and reduces spalling requiring emergency patching, and thereby extending the bridge deck life span. This process is envisaged as an end of bridge deck life treatment. The ultimate goal is to forgo another costly deck rehabilitation project and save that money for a deck replacement, or superstructure replacement in the near future.
状态: Active
资金: $112,450
资助组织: Purdue University/Indiana Department of Transportation JHRP
主要研究人员: Baah, Prince
开始时间: 20180901
预计完成日期: 20201130
实际结束时间: 0
相关文献
检索历史
应用推荐