Concrete-Filled Steel Tube to Concrete Pile Cap Connections � Further Evaluation/Improvement of Analysis/Design Methodologies
项目名称: Concrete-Filled Steel Tube to Concrete Pile Cap Connections � Further Evaluation/Improvement of Analysis/Design Methodologies
摘要: The Montana Department of Transportation has found concrete-filled steel tube (CFST) piles connected at the top by a concrete pile cap to be a very cost effective support system for short and medium span bridges. This type of system offers low initial cost, short construction time, low maintenance requirements, and a long service life. While the gravity load performance of these systems is well understood, their strength and ductility under extreme lateral loads (e.g., seismic events) is more difficult to reliably predict using conventional design procedures. The proposed research aims to further develop newly established design and analysis methodologies, and to ultimately ensure the desired bridge performance. The primary objective of the project is to further validate/improve MDT�s CFST to concrete pile cap connection design/analysis methodologies, and to ensure the efficacy of these methodologies for a wide variety of potential design configurations. Work will begin by identifying potential gaps in the existing design/modeling strategies, and then designing tests that will help close these gaps. System attributes to be considered include cap dimensions, CFST diameter, and number of embedded piles--parameters which have not been varied in the experimental tests completed to-date. Physical tests will then be conducted and analyzed, with the results being used to develop recommendations as appropriate to improve the analysis and design methodologies.
状态: Active
资金: $217,405
资助组织: Montana Department of Transportation
管理组织: Montana Department of Transportation
项目负责人: Kline, Will
执行机构: Montana State University, Western Transportation Institute
主要研究人员: Berry, Michael
开始时间: 20180710
预计完成日期: 20220930
实际结束时间: 0
检索历史
应用推荐