原文传递 Maintenance implementation plan for the B Plant/WESF. Revision 4
题名: Maintenance implementation plan for the B Plant/WESF. Revision 4
作者: Lueck, B.H.;Tritt, S.E.;
关键词: 05 NUCLEAR FUELS; HANFORD RESERVATION; STORAGE FACILITIES; MAINTENANCE; CESIUM; STRONTIUM; ENCAPSULATION; STORAGE; ADMINISTRATIVE PROCEDURES; COMPLIANCE; TRAINING; SCHEDULES
摘要: This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the B Plant/WESF (Waste Encapsulation Storage Facility) complex. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at B Plant/WESF. The B Plant WESF facility complex consists of three main facilities and several support structures located in the 200 East Area of the Hanford site. B Plant is a transition facility that is required to ensure safe storage and management of WESF (operating facility) cesium and strontium capsules. B Plant/WESF also contains substantial radiological inventory from previous campaigns. There are no production activities at B Plant, but several of its operating systems are required to accomplish the current B Plant/WESF mission. B Plant/WESF are each considered a nuclear facility due to the storage of cesium and strontium capsules at WESF and the large radiological inventory from past processing.
总页数: 50p
报告类型: 科技报告
相关文献
检索历史
应用推荐