Impacts of Internally Cured Concrete Paving on Contraction Joint Spacing
项目名称: Impacts of Internally Cured Concrete Paving on Contraction Joint Spacing
摘要: The primary research objective of this research study is to perform a full-scale field demonstration of the internally cured (IC) technology and its efficient performance benefits for Iowa's city and county roadways and state highways. In consultation with the project TAC, two upcoming construction projects conducted by the city, county, or Iowa DOT will be identified for IC concrete field demonstration. As already noted, such technology is suitable for use in a variety of transportation infrastructure components, including roads, bridges, sidewalks, rest areas, etc. Two potential sites of interest to Iowa county engineers are W61 Riverside Road in Washington County, Iowa, and County Road W34 in Winneshiek County, Iowa. At least one of these two sites, IC concrete technology would be implemented in a concrete overlay project to evaluate the performance of such pavement systems, and there is a strong likelihood that it would be found beneficial to implement both pavement sections using IC concrete technology. A focused project management strategy, essential for the successful completion of the project, is represented by the specific objectives of this project to be achieved through the execution of the following proposed research tasks: Task 1: Kick-off TAC meeting and identify potential sites for field implementation projects. Task 2: Laboratory characterization and evaluation of internal curing mixtures for use in field implementation projects. Task 3: Develop field implementation and evaluation plan. Task 4: Execute field implementation and evaluation plan. Task 5: Data analysis. Task 6: AASHTOWare Pavement ME modeling and analysis. Task 7: Economic analysis for field implementation projects. Task 8: Develop preliminary draft report. Task 9: Revise draft report based on TAC comments and discussion. Task 10: Final Report and presentation.
状态: Active
资金: 263903
资助组织: Iowa Department of Transportation
管理组织: Iowa State University, Ames
项目负责人: Goetz, Vanessa
执行机构: Iowa State University, Ames
主要研究人员: Zhang, Yang
开始时间: 20180322
预计完成日期: 20220930
实际结束时间: 0
检索历史
应用推荐